Our History

1962

Fired heater company set up in Brighton, UK serving the town’s gas reforming plants in the vicinity

1969

First overseas order of 16 heaters including platformer units to Cyprus

1972

Delivers 15 Horizontal tube heaters for ‘Come by Chance’ Refinery, Canada

1973

Supplies 7 stabilizer reboilers to Seal Sands Teeside UK

1975

Wins order for vertical tube reforming furnace for ammonia plant in Basrah, Iraq

1977

Secures biggest order to date -25 furnaces for Cochabamba and Santa Cruz Refineries, Bolivia.  Consisting of a range of heater types including Crude, Hot oil, Catalytic Reformers and reboilers

1977

Local MP Tim Sainsbury visits the offices to recognise the export achievements

1980

Designs and fabricates steam heaters for Train 3 Petrochemical unit at Valuepark Chemical Plant in The Netherlands. Then leverages its knowledge and customer satisfaction to later deliver train 4 unit

1983

Awarded contracts for a total of 17 heaters for the Pertamina /Balikpapan projects in Indonesia including: Crude, Reactor, Charge, Stripper Reboiler, Platformer Charge, Superheater, Debutaniser Reboiler, and Vacuum Charge Heaters

1985

Delivered 10 heaters to Reliance in India- Xylene rerun boiler with Airpreheat system, Stripper reboilers, Charge and Interheaters

1986

Opens new offices in Southwick, UK

1987

Installs heater to an area of outstanding natural beauty in the UK with high spec environmental requirements

1988

Transported on a barge a fully modularised CCR unit across the River Thames

1989

Order for equipment on a project utilising government available financing to North Africa

1991

Engineers, designs, fabricates and installs 2 reforming furnaces for Ulsan Refinery, Korea

1992

The Queen opens refinery with equipment supplied by company, senior management in attendance

1993

Delivers 2 crude oil furnaces for Grangemouth / Kinneil Refinery in Scotland

1991-94

Contract for 3 heaters and reforming furnace for a new plant in Singapore

1994

Selected as heater vendor to politically strategic project in Norway

1995

Attends House of Commons Dinner hosted by local MP with key clients

1996

In an effort to overcome the engineering skills shortage, BIH starts its own programme for school leavers and promising employees, which includes a university education for one of its apprentices

1996

BIH build up modularised furnace adjacent to the Conoco Immingham Combined Heat & Power Plant, move it to the foundations and have the furnace in-service within a 30-day shutdown

1996

Delivers 6 heaters to Saudi Arabia

1997

Boustead International Heaters (BIH) established with the backing of Boustead Singapore Limited

1999

BIH wins a significant contract for delivery of multiple fired heaters to South America, its first to the region

2001

BIH supplies fired heaters for a complex PDH project in southern Europe, its largest contract to date

2002

BIH successfully diversifies into WHRU supply with an initial order of 2 units to Algeria’s,  In Salah Gas Project. Building on its capability and track record in Fired Heaters

2003

BIH executes order for 100+ tube hydrogen reformer utilising leading licensor technology for European delivery

2004

BIH receives its first order supplying fired heaters to an LNG project in Africa

2006

BIH opens its first office in Asia, with the creation of the Malaysia Business entity which has capabilities in all project execution disciplines

2006

BIH opens office in Calgary, Canada

2008

BIH expands its operations in Asia, opening an office in Singapore

2009

BIH moves its UK headquarters to larger wholly-owned premises

2010

BIH establishes joint venture and office in Saudi Arabia

2011

BIH supplies novel equipment on a Coal-to-Liquids project in Australia

2011-2014

BIH secures Supplier of Choice Agreement to provide engineering and supply of multiple fired heaters to Canada

2012

BIH supply critical equipment for a significant PDH project in USA utilising leading process licensor technology

2013

BIH enters a consortium agreement with a leading global gas turbine supplier to deliver an ORC process upgrade for a power station in Asia

2019

BIH awarded a c. $75m contract for the supply of 20 WHRU for operation in extreme conditions

2020

BIH delivers multiple heaters for an iBDH project in USA which once in service is said to become “the most efficient and reliable Olefins process in the world”

2020

BIH secures contract to supply novel OTSGs to a market leading turbine vendor for offshore combined cycle operation

2022

BIH acquire Birwelco USA. Based in Texas, Birwelco is a leading supplier of specialised services and support for fired heaters from design to turnkey implementation.

2022

BIH celebrates 25 years of successful operation and consistent growth

2023

Leveraging its multi-time zone footprint, BIH Group delivers plant critical equipment within a matter of days of enquiry to a client in the UK during a TAR event

2023

BIH enters into contract to co-develop and supply core equipment for a novel plastics recycling process designed to tackle previously unrecyclable plastics, contributing to the circular economy

2023

BIH supplies the first Hydrogen-firing ready heater to the UK, which is also the largest ever single item to be moved on British roads

2024

BIH secures significant furnace contract from global chemicals major for delivery to the USA through collaborative development of innovative modularisation and construction philosophy

2025

BIH installs over 160 solar panels on all UK buildings generating ~75KWh of clean renewable energy per year, continuing on our commitment to sustainability

BIH solar panels

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Please fill in the form to receive your download

Please fill in the form to receive your download

Please fill in the form to receive your download