Delivering at Scale: 3000T Ethylene Furnace Sets Sail

BIH is proud to announce the successful completion and load-out of a 3000T Ethylene Steam Cracker Furnace. recently shipped from a module yard in Thailand and now en route to the United States.
End-to-End Execution for Seamless Plant Shutdown

During a critical plant shutdown spanning December 2025 to January 2026, BIH successfully supported one of our clients in Nigeria with the delivery, installation and ongoing commissioning supervision of essential Fired Heater spare parts.
Methane Reformer – A Fine Line

BIH have successfully completed the supply of a precision engineered transfer line destined for an SMR within a methanol production facility in Saudi Arabia.
Damper Excess Air Solutions from the BIH Group

The key to addressing excess air starts with a stack damper capable of reliably and consistently maintaining the flue gas pressure at the radiant arch.
AFRC Whitepaper – Automated Excess Air Control in Fired Heaters

Following on from the ground breaking presentation of BUSA’s proprietary solution for improved control of excess air at the AFRC.
Wide Load! BIH Hydrogen Heater

The journey of the UK’s first Hydrogen ready heater has been well documented including the final trip from port to site last weekend.
Designed, Fabricated, Delivered!

Like the last piece of a jigsaw puzzle! Realised from the concept drawing through to installation. Another successful turnkey project completed by BIH.